b4Adventure SLA.887 Manuel - Page 5

Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} b4Adventure SLA.887. b4Adventure SLA.887 6 pages.

5. MAINTENANCE OF YOUR CLIMBING ROPE SWING
At the beginning of each play season:
• Tighten all hardware.
• Check all protective coverings on bolts, pipes, edges and corners. Replace if they are loose, cracked
or missing.
• Check all metal parts for rust. If found, sand and repaint using a non-lead based paint meeting the
requirements of 16 CFR 1303.
• Check all moving parts including disks, ropes, cables, and chains for wear, rust, or other deterioration.
Replace as needed.
• Check the rope and disks for deterioration, cracking or fraying. If found, DO NOT USE and dispose of
immediately.
• X.3.1.1 Loose-Fill Materials: X.3.1.1 Maintain a minimum depth of 9 in (23 cm) of loose-fill materials
such as wood mulch/chips, engineered wood fiber (EWF), or shredded/recycled rubber mulch for
equipment up to 8 ft (2.4 m) high; and 9 in (23 cm) of sand or pea gravel for equipment up to 5 ft (1.5 m)
high. NOTE: An initial fill level of 12 in (30 cm) will compress to about a 9 in (23 cm) depth of surfacing
over time. The surfacing will also compact, displace, and settle, and should be periodically refilled to
maintain a least a 9 in (23 cm) depth.
Twice a month during play season:
• Tighten all hardware.
• Check all protective coverings on bolts, pipes, edges and corners. Replace if they are loose, cracked
or missing.
• X.3.1.1 Loose-Fill Materials: X.3.1.1 Maintain a minimum depth of 9 in (23 cm) of loose-fill materials
such as wood mulch/chips, engineered wood fiber (EWF), or shredded/recycled rubber mulch for
equipment up to 8 ft (2.4 m) high; and 9 in (23 cm) of sand or pea gravel for equipment up to 5 ft (1.5 m)
high. NOTE: An initial fill level of 12 in (30 cm) will compress to about a 9 in (23 cm) depth of surfacing
over time. The surfacing will also compact, displace, and settle, and should be periodically refilled to
maintain a least a 9 in (23 cm) depth.
Once a month during play season:
• Check all moving parts including disks, ropes, cables, and chains for wear, rust, or other deterioration.
Replace as needed.
• At the end of each play season or when the temperature drops below 32 Degrees Fahrenheit take in
your NINJA ROPE and store indoors in cool dry location.
• X.3.1.1 Loose-Fill Materials: X.3.1.1 Maintain a minimum depth of 9 in (23 cm) of loose-fill materials
such as wood mulch/chips, engineered wood fiber (EWF), or shredded/recycled rubber mulch for
equipment up to 8 ft (2.4 m) high; and 9 in (23 cm) of sand or pea gravel for equipment up to 5 ft (1.5 m)
high. NOTE: An initial fill level of 12 in (30 cm) will compress to about a 9 in (23 cm) depth of surfacing
over time. The surfacing will also compact, displace, and settle, and should be periodically refilled to
maintain a least a 9 in (23 cm) depth.
b4 Adventure 4010 Holly Street Unit 16 • Denver Colorado 80216 • 1-844-834-4334 QUESTIONS?
[email protected] · www.b4adventure.com 303-339-0482 - DC:080818
5