fine fixtures TDF1 Manuel d'installation - Page 8
Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} fine fixtures TDF1. fine fixtures TDF1 8 pages. Fixed frameless shower panel
5
SECURING THE GLASS
Secure the glass in the rail, using
a caulking gun and high-quality
clear silicone caulk.
DRYING THE GLASS
Let the glass dry for 24 hours.
Do not touch, move, or make
wet during these hours.
F I N E
F I X T U R E S
206 WEMBLY ROAD - NEW WINDSOR, NY 12553
P: 718.602.6060 F: 718.963.2082 - E: [email protected]
TOLL FREE: 1.877.8FIXTURES
FINEFIXTURES.COM
RETAIN THIS INSTALLATION MANUAL FOR FUTURE REFERENCE.
AFTER
INSTALLATION
WAIT 24 HRS
BEFORE USE