Ariel WS-9090K Direction de l'installation - Page 7
Parcourez en ligne ou téléchargez le pdf Direction de l'installation pour {nom_de_la_catégorie} Ariel WS-9090K. Ariel WS-9090K 8 pages. Steam bathroom
1
2
3
C
C
1
Time adjustment pitch+
2
Temperature adjustment pitch+
3
CeilingLamp/Back Lamp pitch
4
Time adjustment pitch-
09
4
5
6
7
8
5
Temperature adjustment pitch-
6
Fan Pitch
Steam Pitch
7
8
Main Cock Pitch
6. Install the glass door onto the tray
Put the plastic pad onto the aluminum
post of glass door,if the length of the
plastic is not suitable for the aluminum
post,you can cut it in suitable size,then
put it on the tray,screw with bolts.
M 6 X 2 5
S t 4 X 2 0
S t 4 x 2 0
STEP 7
4 X 2 0
STEP 6
7. install the roof
Leave the roof onto the top of shower
body,then fix tightly with bolts.Then
install spare parts.
A. Finish assembling the whole set,in
order to aviod water and steam
leaking,except the position of sliding
glass door do not use the silicone, the
silicone should be used on all else
connecting position .
B. While connecting the cold and hot
water pipe,wipe the silicone on the
connecting mouth to make it will be
connected very well.
C .
S k e t c h m a p o f
connection(show as the picture).
D. Assembly of spare parts(shower
and so on)
A f e r a l l s p a r e p a r t s h a v e b e e n
installed well,put on the power
supply and cold/ hot water switch to
check whether all functions work
p i p e
06