Ariston UNO Manuel d'instructions d'installation - Page 4
Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Ariston UNO. Ariston UNO 17 pages. Wall-hung combination boiler
1.2
O
V
VERALL
IEW
1
2
3
4
5
6
7
8
9
10
11
12
13
14 15
F
. 1.0
IG
7 - Visual check of the primary heat exchanger:
-
check for overheating in the blade assembly;
-
clean the exhaust fan if needed.
8 - Adjustment of the gas pressures: ignition pressure, partial load and full load.
9 - Check the heating safety systems:
- safety device for maximum temperature;
- safety device for maximum pressure.
10- Check the gas safety systems:
- safety device for lack of gas or flame ionisation (detection electrode);
- safety device for gas cock.
11- Check the electrical connection (make sure it complies with the instructions in
this manual).
12- Check domestic hot water production efficiency (flow rate and temperature)
13- General check of the combustion by-products of the discharge/ventilation
system.
14- Check the general performance of the unit.
25
24
23
22
21
20
17
18
19
IN013A
L
:
EGEND
1.
Flue connector
2.
Air intake for twin pipe flue systems
3.
Fan
4.
Combustion chamber hood
5.
Main heat exchanger
6.
Main circuit temperature probe (flow sensor)
7.
Combustion chamber
8.
Combustion chamber insulation panel
9.
Burner
10.
Detection electrode
11.
Ignition electrodes
12.
Motorised diverter valve
13.
Safety valve (3 bar)
14.
Secondary heat exchanger
15.
Gas valve
17.
Domestic cold water inlet filter
18.
Spark generator
19.
Domestic hot water flow switch
20.
Boiler drain valve
21.
Circulation pump with automatic air release valve
22.
Main circuit temperature probe (return sensor)
23.
Expansion vessel
24.
Air pressure switch
25.
Combustion analysis intakes
4