Ariston TVF 75 C Livret d'instructions - Page 3

Parcourez en ligne ou téléchargez le pdf Livret d'instructions pour {nom_de_la_catégorie} Ariston TVF 75 C. Ariston TVF 75 C 16 pages.

Ariston TVF 75 C Livret d'instructions
Electrical connections
Before plugging the appliance into the
socket, check the following:
Make sure your hands are dry.
The socket must have an earth connection.
The socket must be able to withstand the
machine's maximum power output as
indicated on the rating plate (see Description
of the tumble dryer).
The power supply voltage must fall within
the values indicated on the rating plate (see
Description of the tumble dryer).
Do not use extension leads. Do not pull the
power supply cable. Do not use multiple plug
adaptors if the appliance is fitted with a plug.
For appliances with fitted plug, if the plug is
not suitable for you socket outlet, contact a
qualified technician.
The dryer must not be installed outdoors,
even if the space is sheltered.
Once installed, the dryer's electrical wire
and plug must be within reach.
The power cord must not be bent or
squashed.
If the plug being replaced is a non-
rewirable type, then the cut-off plug must be
disposed of safely. DO NOT leave it where it
can be inserted into a socket and create a
shock hazard.
The electric cord must be regularly
checked. If the supply cord is damaged, it
must be replaced by service agent.
Service).
The manufacturer denies any
responsibility should any of these rules not be
followed.
If in doubt about any of the above
consult a qualified electrician.
Levelling the tumble dryer
The tumble dryer should be installed level in order to
operate correctly.
After installing the tumble dryer in its permanent position,
make sure it is level; check its side-to-side levelling first,
followed by front-to-back.
If the tumble dryer is not perfectly level, use a wooden block
to support it while you adjust the two front feet, up or down
as necessary.
Before you start your dryer
Once the tumble dryer is installed, clean the inside of the drum
before operating it and remove any dirt accumulated during
transportation.
see
(
GB
3