• Electrical System Inspection:
-
Check Manual Actuators are secure, clean, undamaged.
-
Check that anti-tamper seals/pull pins are in place and secure.
-
Check all wiring, connection and supports are in intact, undamaged and in correct
position.
• Labels:
-
Check manual release, system warning and instruction labels are in place and legible.
• Test the fault monitoring system by disconnecting and reconnecting all connected
detection devices and the siren strobe circuit one at a time. Ensure the "Fault" LED indicator
illuminates and the internal sounder is heard each time a circuit is disconnected.
• Discharge Testing from Control Panel:
-
Perform a manual discharge test by pressing and holding both mode switches on the
panel continuously for 5 seconds.
-
Following activation, ensure the Test Module Red LED has operated.
-
Isolate the panel to silence alarm. Panel should now display a fault.
-
Reset Test Module. Panel should no longer be in fault condition.
-
Turn off the Isolate function.
• Discharge Testing from External Devices: Each detection and manual actuator device
connected to must be tested individually.
-
Perform an automatic discharge test by activating the detectors or manual actuators.
-
Following the activation sequence ensure the Test Module Red LED has operated.
-
Isolate the panel to silence the alarm. The control panel should now display a fault.
-
Reset the Test Module.
-
Reset the control panel by pressing and holding a single mode switch until 2 beeps are
heard. The control panel should no longer be in alarm/fault condition.
• System control and indicating equipment.
-
During discharge test, ensure operation of all installed siren/strobe(s).
-
During discharge test, ensure operation of all installed shutdown relays.
shutdown any equipment specified in the risk assessment.
-
Test backup battery capacity. Replace every backup battery every 2 years.
• Disconnect the FP-08800 Test Module and reconnect all FirePro aerosol generators.
• Turn off the Isolation function. System is now operational.
Additional requirements for Commissioning of a System after Install or Discharge
• Design Survey - check against the baseline data, for alterations, changes in use or
operating environment, or other factors that could affect the performance of the fire
protection system. (Annual)
• Risk Assessment – required to be prepared and reviewed every 5 years or after any
incident. Review document to ensure system compliance. Check if document is current.