ErgoCentric upCentric Power & Data Rail Manuel - Page 17

Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} ErgoCentric upCentric Power & Data Rail. ErgoCentric upCentric Power & Data Rail 19 pages.

Installation Guide
upCentric Power & Data Rail
b . CPI Legs:
i . Feed the Ethernet cables down the Ceiling pole, using the channel
opposite the power cable .
ii . Pull the cables down through the pole and into the First Rail and
through entire system
iii . Run the cables through the upper channel in the Power & Data Rail system,
ensuring that the Ethernet endings reach their intended locations (refer to layout
for larger systems) . Leave approximately 6"-12" of slack for each cable .
iv. Utilize wire the Data Cable Support Clip (E) to secure the wires to the top of the upper
channel as you run them through the system, ensuring they remain in place .
Note: It may be necessary to loosen the power pole ceiling bracket and lift the ceiling pole off the
leg to facilitate the pulling of all Data cables .
Power channel
DETAIL B
SCALE 1 : 2
upCentric Power & Data Rail | Installation Guide
Data Channel
B
C
Data channel
Power Channel
Data Channel
C
DETAIL B
SCALE 1 : 2
Power Channel
17