Lenovo SE350 Manuel - Page 9
Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} Lenovo SE350. Lenovo SE350 12 pages. Toolless friction rail v2
Également pour Lenovo SE350 : Manuel de configuration et d'installation (24 pages), Démarrage rapide (2 pages), Manuel (8 pages)
Slide System into Rails in Rack
Step 1. Carefully lift the server and align the server with the slide rails. Position the server as shown and push the
server into the rack.
Step 2. Press the release latches.
Step 3. Push the server all the way into the rack until the server locks into place with a click.
9 9