Acorn Safety S1360-HT Instructions d'installation, d'utilisation et d'entretien - Page 2

Parcourez en ligne ou téléchargez le pdf Instructions d'installation, d'utilisation et d'entretien pour {nom_de_la_catégorie} Acorn Safety S1360-HT. Acorn Safety S1360-HT 11 pages. Heat traced shower

Installation & Operation Manual

PRELIMINARY STEPS

1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation.
3. Flush water supply lines prior to installation. This will remove unwanted debris from the lines and prevent unwanted
blockages in the safety equipment.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is provided for
documentation purposes.
5. All employees at risk of contamination should be informed and trained in the use of this and any other safety equipment.
The signage provided should be posted appropriately in close proximity to this equipment.
ROUGH-IN
Acorn Safety
a division of Acorn Engineering Company™
Manual #7109-208-001
3" [76]
1
PEDESTAL BASE
2 " [13]
3 " [232]
Ø9
8
3 3 4 " [95]
7 1 2 " [191]
Page 2 of 11
3 " [10]
Ø 8
Revised: 11/12/18