CAME FAST Series Manuel d'installation - Page 14

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} CAME FAST Series. CAME FAST Series 17 pages. Straight transmission arm
Également pour CAME FAST Series : Procédure de montage (2 pages)

CAME FAST Series Manuel d'installation
7.3 Maintenance
Periodic maintenance log kept by the user (every 6 months)
Date

7.4 Extraordinary maintenance

The following table is for logging any extraordinary maintenance, repairs or upgrades performed by licensed, specia-
lised firms.
N.B.: only entrust licensed, specialised firms to perform any extraordinary maintenance.
Extraordinary maintenance log
Installer's stamp
Job performed______________________________________________________________________________________
________________________________________________________________________________________________
Installer's stamp
Job performed______________________________________________________________________________________
________________________________________________________________________________________________
Installer's stamp
Job performed______________________________________________________________________________________
________________________________________________________________________________________________
14
Notes
Operator name
Date of job
Technician's signature
Requester's signature
Operator name
Date of job
Technician's signature
Requester's signature
Operator name
Date of job
Technician's signature
Requester's signature
Segnature