3form SimpleSpec 200.53-HooDoo Manuel d'installation - Page 4
Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} 3form SimpleSpec 200.53-HooDoo. 3form SimpleSpec 200.53-HooDoo 8 pages.
Ready To Go
SimpleSpec 200.53-HooDoo
Installation
1
Drill Pilot Holes
Use provided Installation template (3-15-2161) to drill pilot holes
into floor substrate. Use appropriate pilot hole diameter and depth
for the type of substrate you are fastening to.
2
Attach Feet to Floor
Use appropriate screws to fasten 6 center feet
(3-15-2167 or 3-15-2189) and 2 end feet (3-15-2168 or
3-15-2190) to the floor.
1
For more information, please visit 3-form.com or call 800.726.0126
OctOber 2018 | MAN-rtG-200-53 | reV 001 © 2018 3form, Inc. All rights reserved.
Template
-
Left
End Foot
-
-
or
-
-
*Note correct orientation of the end foot.
Substrate
concrete
-
Door Opening
tm
Installation Manual
Ø
Depth
5/16"
½"
Wood
5/ 6 4"
2"
6
1
Anchors
confast: MS8
#8�2" FH Screw
Center Feet
-
-
or
-
-
Right
End Foot
-
-
or
-
-
4