Altra Industrial Motion Warner Electric PB-120 Manuel d'instructions d'installation - Page 3
Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Altra Industrial Motion Warner Electric PB-120. Altra Industrial Motion Warner Electric PB-120 18 pages. Primary brakes
Send Quote Requests to [email protected]
3 . Once the mounting surface has been
prepared, the magnet is bolted in place with
capscrews and lock wash ers . (Figure 2 .)
4 . After assembly, the magnet must be
concentric and square within the required
tolerances listed on the illustration drawing .
C. Assembling the Armature and Hub
1 . The antibacklash armatures are shipped
assembled and ready to be installed . See Step D .
2 . The standard armature and hub must be
assembled before it can be installed . Assemble the
armatures so that the shiny surfaces (120 and 170)
or backing plate sides (250 and 400) are against the
hub retainer ring (Figure 3) .
Warner Electric • 800-825-9050
Figure 2
Send Quote Requests to [email protected]
Call +1(800)985-6929 To Order or Order Online At Warnerelectricparts.com
Call +1(800)985-6929 To Order or Order Online At Warnerelectricparts.com
Figure 3
3 . An optional release spring may be used with the
stan dard armatures and hubs . The release spring
forces the armature back against the hub retainer
ring when the magnet coil is de-energized .
Follow these instructions to assemble the armature
and hub when the optional release springs are being
used .
P-201-WE • 819-0480 3