Dixon Bayco EZ-CEPT FT390 Series Instructions d'entretien et d'utilisation - Page 2

Parcourez en ligne ou téléchargez le pdf Instructions d'entretien et d'utilisation pour {nom_de_la_catégorie} Dixon Bayco EZ-CEPT FT390 Series. Dixon Bayco EZ-CEPT FT390 Series 7 pages. Double sockets

10428 INSTRUCTION MANUAL - DUAL SOCKETS
FloTech sockets are mechanically and functionally compatible with API 1004 Cargo Tank
Bottom Loading Recommended Practice.

INSTALLATION INSTRUCTIONS:

Sockets are to be mounted on the same side of the trailer as the bottom loading equipment.
Sockets are normally located within 3 feet of the bottom loading adapters so the rack plug and
cord will reach the socket without over stretching the cord. Use the socket body as a template to
drill four 5/16" holes as shown in Diagram 1. Mount the socket body to the trailer using four
5/16" bolts and lock washers.
DIAGRAM 1
877.582.3569
2
REV B 2019/12/10