Artic AR-SC7P-144F-M Manuel d'installation - Page 15
Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Artic AR-SC7P-144F-M. Artic AR-SC7P-144F-M 16 pages. Horizontal fiber optic splice closure
5.10 Step ten – Assemble FOSC housing and fix FOSC
5.10.1 Put the desiccant into the closure
5.10.2 Put FOSC cover on base directly.
5.10.3 Install plastic hoop between FOSC cover and the base, tighten hoop locking system,
which is to be fixed by hoop fixing bolt then.
5.10.4 All nuts (plastic ones) of base need to be retightened once more.
5.10.5 FOSC installation
(1) Wall-mounting: Installation of closure on the wall mounting accessories, then fixed on
the wall by expansion screw. See drawing10
(2) Pole-mounting: Installation of closure on the pole accessories, then fixed on the pole
with hose clamps. See drawing11
INSTALLATION MANUAL HORIZONTAL FIBER OPTIC SPLICE CLOSURE AR-SC7P-xxxF-M
16