EdilKamin IRIS Manuel - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} EdilKamin IRIS. EdilKamin IRIS 12 pages.

COVERINGS
Model with ceramic or ollite side covering.
Covering parts list:
• 1 side tiles (4 pcs)
• 2 side aluminium panels (4 pc)
• 3 cast iron top
• 4 pellet hopper cover
• 5 top tiles
• 6 cast iron base
After positioning the frame according to the
instructions shown in the
INSTALLATION INSTRUCTIONS
chapter, proceed as follows in the order shown:
• remove cast iron top by unscrewing the 16 screws
under the top ceramic tiles (5) and the two screws
located at the rear (y),
• remove the aluminium side panel (2) fastening
component (7),
• slip the four ceramic side components into the
aluminium side guides from above,
• replace the fastening component (7),
• replace the top and fasten it.
- 19
-