Cutting Edge 100A MPPT Manuel de l'utilisateur - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel de l'utilisateur pour {nom_de_la_catégorie} Cutting Edge 100A MPPT. Cutting Edge 100A MPPT 8 pages. Charge controller
CONNECTIONS:
1. Always connect the battery first, then solar panels. This is to prevent a voltage surge or spike from
damaging the sensitive electronics in the charge controller.
2. Connect the solar panels second.
23V maximum solar panel Open Circuit Voltage (VOC) input for charging 12V battery/batteries.
46V DC maximum solar panel Open Circuit Voltage input (VOC) for charging 24V batteries.
See "Specifications" for more details.
3. If applicable, connect "load" last.
4. Reversing the polarity will result in a damaged charge controller and will void the warranty.
BUTTON GUIDE:
Menu button: short press to scroll through settings. Long press to modify settings.
Up button: Short and long press does nothing from home screen. Use to adjust settings
after long pressing the menu button.
Down button: Short press turns on/off the "load" output. Use to adjust settings after long
pressing the menu button.
Long press at home screen to engage or disengage the "load" function.
WHAT THE HECK IS THE "LOAD" OUTPUT
FUNCTION?
The load function is typically used for lighting applications, hence the light bulb icon. It can commonly be
set to turn on a load output after dusk (when the charge controller detects 8V or less, it assumes it's night
time). The time aspect (24h, 1-15h, 0h) is the time the load output will remain engaged. After this time is
elapsed, the load output will be disengaged.
Important: The load voltage settings and time settings must be satisfied in order for the load output to
engage.
Rev 20200515
Innovative Renewable Energy Solutions
Page 6