Blue Coat ProxySG 9000 Series Manuel de conformité - Page 11
Parcourez en ligne ou téléchargez le pdf Manuel de conformité pour {nom_de_la_catégorie} Blue Coat ProxySG 9000 Series. Blue Coat ProxySG 9000 Series 14 pages.
Step 7: Apply one short label across the edge of the middle panel as to secure the panel to
the chassis. The label should be placed approximately three-quarters of an inch
beyond the release tab.
Step 8: Rack mount the appliance. Refer to the SG9000 Quick Start Guide for instructions
and safety information on rack-mounting the appliance.
Step 9: Reinstall the power cables.
Step 10: Reinstall the network cables.
Step 11: Power-on the system.
SG9000 Tamper Evident Panel and Label Installation
Step 7
Short Label
x1
11