Etac Molift Air 300 Manuel de l'utilisateur - Page 7
Parcourez en ligne ou téléchargez le pdf Manuel de l'utilisateur pour {nom_de_la_catégorie} Etac Molift Air 300. Etac Molift Air 300 15 pages.
Assembly and installation
The hoist is marked with Safe Working Load
(SWL), this should not exceed rail systems max
load capacity.
The rail system can only be
installed by certified personnel in
accordance with applicable installa-
tion instructions.
Do not start using hoist before
completing control according to
checklist after installation.
Trolley installation
Mounting trolley in rail system
Remove End stop and insert Trolley into rail.
Mount end stop, and make sure it is securely
fastened
Make sure end stops are mounted
in all ends of the Rail system before
using the hoist!
Installation
Lifter installation
Mounting of Lifter on trolley. No tools required.
The lifter has two connection points.
Connect one point first. Push button all the way
in, and place lifter in connection point on trolley.
Release button and make sure it is clearly show-
ing green before connecting the next point.
Make sure both connection point buttons
completely return and clearly show green after
installation.
Emergency lowering cord and tube can be
adjusted to the correct length (height) by cutting
tube and cord.
Checklist after installation
Use this checklist to verify that the hoist is
properly installed and can operate correctly an
d safely before use.
End stops on rail are installed after mounting
of trolley
Make sure that the hoist is properly fastened
to the rail and that the lift does not have any
loose parts.
Perform one lift with normal load (60-80 kg)
Make sure battery is fully charged.
6