CLINTON INDUSTRIES 1190E Manuel - Page 11

Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} CLINTON INDUSTRIES 1190E. CLINTON INDUSTRIES 1190E 19 pages.

7.1.0 Using the Built-in Test Program
To enter: Press simultaneously the ARROW- RIGHT and the SBT button., release the
ARROW-RIGHT button first! Otherwise you are back in the main program!
The display should read:
To go to the first group, press the "ARROW-ROUND" button
The display reads:
Then it reads the position of the threadle:
This can be:
If the threadle is in forward position, the displayed number is the reading of the
ADC- converter.
The lowest number should be below ten (10) and the highest number at least 245
To go to the next group, press the "ARROW-ROUND" button again
The next group is:
Turn the hand wheel and the display reds all 3 positions:
NEEDLE-UPor/ NEEDLE-DOWN or TRIM
To go to the next group, press the "ARROW-ROUND" button again
The next group is:
Then activated inputs are displayed
If no inputs are activated, the display reads " ---------------- "
To go to the next group, press the "ARROW-ROUND" button again
The next group is:
After two seconds, the display reads:
To activate the output, press the "NEEDLE-UP / NEEDLE-DOWN button.
To go to the next output, press the "ARROW-UP" button.
The next reading is;
To go to the next output, press the "ARROW-UP" button.
To go to the former output, press the "ARROW-DOWN" button

TEST MODE

TEST TREADLE
1. NEUTRAL
2. FORWARD and a number
B)
HEEL 1
C)
HEEL 1 / HEEL 2
test synchronizer
test inputs
(this will be displayed for two seconds)
test outputs
-1- PRESSERFOOT
- 2 – NEEDLE COOLER
for about 2 seconds