Etac Molift Smart 150 Manuel de l'utilisateur - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel de l'utilisateur pour {nom_de_la_catégorie} Etac Molift Smart 150. Etac Molift Smart 150 20 pages.
Également pour Etac Molift Smart 150 : Manuel de l'utilisateur (19 pages)
Disassembly
• Run the lifting arm all the way down while
holding the suspension up towards the lifting
arm allowing the suspension to be placed into
the transport hook.
• Remove the battery from the lifter to prevent it
from falling out during transportation.
The control electronics are active as long as
the battery is placed in the holder. If the lifter
is to be stored for a longer period, the battery
should then be removed (or emergency stop
activated) to avoid unnecessary discharge of
the battery.
• Open the locking handle, lift up the lifting col-
umn (grab with both hands and lift straight up)
and fold the column down to transport posi-
tion.
The lifter can be split into two parts by lifting
the column from the chassis completely. The
lifting column/-arm and the chassis with legs
are then separate parts.
BM09201 Molift SMART 150 English - Rev E 10/2012
Be careful not to get legs/arms/hands wedged
between the parts when folding down the
lifting column/-arm.
• Fasten the hand control to the driving handle
• Press the legs together and secure legs and lift-
ing column/-arm with the transport elastic.
• Put the lifter into the bag.
Storage
For long time storage it is recommended that the
battery is removed and the emergency stop but-
ton is activated. The lifter can be stored and trans-
ported under the following conditions:
Pressure: 70 - 106 kPa
Humidity: 15 - 93 %
Temperature: -25 - 70 °C
The lifter is designed for use at standard room
temperatures (+5 to +40°C). Following stor-
age or transport at other temperatures leave
the lifter in a room with a suitable tempera-
ture until it reaches a safe operating temper-
ature.
Page 6 of 20