Asgard VANGARD Instructions de montage - Page 3
Parcourez en ligne ou téléchargez le pdf Instructions de montage pour {nom_de_la_catégorie} Asgard VANGARD. Asgard VANGARD 3 pages.
STEP 1
4
2
PARTS
INSTRUCTION
RH BACK - 4
POSITION RH BACK '4' UP TO BASE PANEL '2'
ENSURING HOLES ARE ALIGNED AND THAT
BASE - 2
THE BACK CENTRAL FOLD IS POSITIONED IN
THE CUTOUT SLOT IN THE BASE.
SCREW THE PANELS TOGETHER.
4*
STEP 5
1
B
B ( 0.15 : 1 )
10
PARTS
INSTRUCTION
POSITION DOOR STOP '10' ON THE
TOP - 1
INSIDE OF THE FRONT OF THE TOP '1'
AS SHOWN. ALIGN WITH THE 3
DOOR
CENTRAL HOLES AND SCREW TOGETHER.
STOP - 10
THE LARGE CIRCULAR HOLES ALLOW
ACCESS FOR THE FIXING SCREWS.
3*
STEP 2
COVER PLATE
6
PARTS
INSTRUCTION
POSITION THE RH SIDE '6' UP TO THE PRE
RH SIDE - 6
ASSEMBLED BACK AND BASE ENSURING ALL
HOLES ARE ALIGNED, SCREW TOGETHER.
COVER PLATE
ON THE FRONT TWO FIXING HOLES POSITION
- 9
ONE COVER PLATE '9' IN THE CORNER,
ALIGNING FIXING HOLES, SCREW IN POSITION.
16*
(THE COVER PLATE HIDES THE EXPOSED
SCREW POINTS)
STEP 6
1
C ( 1 : 5 )
C
PARTS
INSTRUCTION
POSTION THE PRE-ASSEMBLED TOP PANEL
TOP - 1
OVER THE CARCASE AS SHOWN ENSURING
THAT THE ASGARD LABEL IS ON THE FRONT
DOOR
RH SIDE OF THE TOP CHECK HOLES FOR
STOP - 10
ALIGNMENT & SCREW IN POSITION.
SEALANT
TO HELP PREVENT WATER INGRESS WE
RECOMMEND APPLYING A BEAD OF 'ALL
18*
WEATHER SEALANT' ON THE FRONT CORNER
JOINTS AS SHOWN PRIOR TO FITTING THE
DOORS.
STEP 3
3
PARTS
PARTS
INSTRUCTION
LOCATE LH BACK PANEL '3' INTO THE BASE AND
LH BACK - 3
RH BACK AS SHOWN ENSURING THAT IT SLOTS
INTO THE CENTRAL BASE CUTOUT AND THAT
THE CENTRAL VERTICAL FOLDS ARE
CORRECTLY ALIGNED.
SCREW TOGETHER ALONG THE BASE AND
13*
VERTICAL JOINT.
STEP 7
7
8
INSTRUCTION
PARTS
WE RECOMMEND THAT YOU USE HAND HELD
DRIVERS RATHER THAN POWER DRIVERS WHEN
LH DOOR - 7
FIXING THE DOORS. IT IS IMPORTANT TO
SUPPORT THE DOORS AT ALL TIMES WHEN
RH DOOR - 8
FITTING THE SCREWS TO ENSURE CORRECT
ALIGNMENT AND SO NOT TO DAMAGE THE
THREADED INSERTS.
18*
ALIGN HINGES OF LH DOOR '7' ( NON
LOCKING) AND RH DOOR '8' (LOCKING)
SCREW IN POSITION.
STEP 4
5
PARTS
INSTRUCTION
LH SIDE - 5
REPEAT STEP 2 WITH LH SIDE '5' AND
THE REMAINING COVER PLATE '9'
COVER PLATE
- 9
16*
STEP 8
D
D ( 0.30 : 1 )
PARTS
INSTRUCTION
HAVING FITTED THE DOORS IT MAY BE
LEVELLERS
NECESSARY TO USE THE LEVELLING SHIMS
- 14
'14' UNDER THE CORNERS OF THE UNIT IN
ORDER TO ACHIEVE AN EVEN GAP AROUND
THE DOORS AND ENABLE THEIR SMOOTH
SEALANT
OPERATION.
WE RECOMMEND APPLYING AN ADDITIONAL
BEAD OF SEALANT ALL ROUND THE OUTER
EDGE OF THE UNIT WHERE IT COMES INTO
CONTACT WITH THE CONCRETE OR FLAGGED
BASE.