ASHAPOWER NEON-30 Manuel de l'utilisateur - Page 5

Parcourez en ligne ou téléchargez le pdf Manuel de l'utilisateur pour {nom_de_la_catégorie} ASHAPOWER NEON-30. ASHAPOWER NEON-30 14 pages. Solar mppt charge controller
Également pour ASHAPOWER NEON-30 : Manuel de l'utilisateur (14 pages)

ASHAPOWER NEON-30 Manuel de l'utilisateur
1.PV Panel Grouping
group the PV panel array according to the recommended grouping chart provided.
Good quality weather proof solar cables must be used.
2.Battery Bank Setup
cables (16 sq.mm minimum) tightly and check each battery separately for specific
gravity and backup.
3.MPPT Charge Controller Installation:
- Mount the MPPT charge controller vertically on the wall.
- Never keep any object on the device blocking the cooling fan.
- Avoid exposure to rain, direct sunlight or high temperature.
- Remove the terminal cover of the device and make sure the device is switched off.
- Connect the device to the battery bank using 16sq.mm/10Sq.mm standard cables.
- Connect the cables from PV panels to the solar terminals of the device with correct polarity.
- Switch ON the Power switch of the device. Three LED Indicators and cooling fan of the device
starts functioning for 5 seconds and goes off.
battery bank and applicable range of PV Panel Open Circuit Voltage (Voc) limit for the
connected battery bank.Ensure the displayed battery bank voltage and connected battery
bank voltage are same when MPPT is powered ON.
the PV Panel voltage detected is higher than the connected battery bank voltage
and green LED lights up. If the PV panel voltage goes below the battery bank voltage
the green indicator goes off. When the device detects more than 2A charging current
to the battery, RED LED lights up. If the current is less than 2A the RED LED goes off.
When the battery voltage reaches 14.0V(Configurable) the BLUE LED lights up and
the phase input to the inverter connected through the MPPT will be blocked. Now
the load starts functioning on inverter (Solar). When the solar charging current stops
the load will be taken from the battery bank and the battery voltage goes down.
Once it reaches 11.0V(Configurable) the device change over the load from inverter to
grid power and the blue LED goes off. Blinking blue LED indicates Low battery bank
voltageie.11.7V (Configurable)giving warning to remove heavy loads. The blinking of
green LED indicates sharing of solar current for battery charging and connected load.
Solar/Grid status can also be monitored remotely by connecting an LED to the
Solar/Grid Monitor Port for a distance up to 30 meters with wire.
- Automatic Grid/Solar power Change Over :
Over is required, follow the instructions below: -
4sq.mm/6sq.mm) to the 'Phase In' part of the terminal on the device. Connect
another wire from the 'Phase Out' part of the terminal to the input phase connector
of the inverter. (Never connect the neutral of the grid power to any terminal of the
charger. Refer Connection diagram provided).
INSTALLATION & OPERATION
:
Using required Solar MC4 connectors and parallel connectors,
:
If more than one battery is used, Connect the interlinking
Display shows the voltage of the connected
The Charger starts functioning when
If the Automatic Grid/Solar power Change
Connect the grid power phase wire (using
4