ASHAPOWER NEON-30 Manuel de l'utilisateur - Page 5

Parcourez en ligne ou téléchargez le pdf Manuel de l'utilisateur pour {nom_de_la_catégorie} ASHAPOWER NEON-30. ASHAPOWER NEON-30 14 pages. Solar mppt charge controller
Également pour ASHAPOWER NEON-30 : Manuel de l'utilisateur (14 pages)

ASHAPOWER NEON-30 Manuel de l'utilisateur
INSTALLATION & OPERATION
1.PV Panel Grouping : Using Solar MC4 connectors and parallel connectors, group the
PV panel array according to the examples given. Good quality weather proof solar DC
cables must be used
2.Battery Bank Setup : If more than one battery is used, connect the inter linking
cables tightly and check each battery separately for speci c gravity and backup .The
length of the connecting cable from MPPT to battery must be less than 1.5 meter. ( 16
sq.mm / 10 sq.mm)
3.MPPT Charge Controller Installation :-
- Mount the MPPT charge controller vertically on the wall using the wall mount clamp
provided .
- Never keep any object on the device blocking the cooling fan.
- Avoid exposure to rain, direct sun light or high temperature.
- Switch o the device and remove the terminal cover
- Connect the device to the battery bank using 16sq.mm / 10 Sq.mm standard electrical cables
upto 1.5 meter length.
- Connect the cables from PV panels to the solar power terminals of the device with
correct polarity.
- Switch ON the Power switch of the device. Three LED Indicators and cooling fan
of the device starts functioning for 5 seconds and goes o .
Display shows the voltage of the connected battery bank and applicable range of PV Panel Open
Circuit Voltage (Voc) limit for the connected battery bank.Ensure the displayed battery bank voltage
and connected battery bank voltage is same when MPPT is powered ON.
The Charger starts functioning when the PV Panel voltage detected is higher than the
connected battery bank voltage and green LED glows. If the PV panel voltage goes below the
battery bank voltage the green indicator goes o . When the device detects more than 2 Amp
charging current to the battery, RED LED glows. If the current is less than 2Amp the RED LED
goes o but charing continues in low Amp. When the battery voltage reaches 14.2V(Near
gravity level - Con gurable) the BLUE LED glows and the phase input to the inverter connected
through the MPPT will be blocked. Now the load starts functioning on inverter (Solar). When the
solar charging current stops, the current for the load will be taken from the battery bank and the
battery voltage goes down. Once it reaches 11.5V(Con gurable) the device changes over the
load from inverter to grid power and the blue LED goes o . Blinking of the blue led indicates low
battery volt ie.11.8V (Con gurable) and warns to disconnect heavy load.The blinking of green
LED indicates sharing of solar power to charge the battery and to the connected load.
Automatic Grid/Solar power Change Over (Converting home inverter to smart
solar inverter) If the Automatic Grid/Solar power Change Over is required, follow the
instructions below: - Connect the Grid power phase wire (using 4sq.mm/6sq.mm) to the 'Phase
In' part of the terminal on the device. Connect another wire from the 'Phase Out' part of the
terminal to the input phase connector of the inverter. For automatic change over function (grid
to solar /solar to grid) keep the GRID BYPASS switch in ON position. When kept it in OFF position
Inverter will always be on Grid power. MPPT disconnects grid power to inverter when the
battery terminal volt reaches 14.2V (Default) and reconnect grid power when terminal volt goes
down to 11.5V (Default) (Never connect the neutral of the Grid power to any terminal of the
charger. Refer examples of Connection diagram provided).
NEON-30 Vers.6
05
05
05