BlueSky Mast AL2 STANDARD Series Fiche de référence rapide - Page 4
Parcourez en ligne ou téléchargez le pdf Fiche de référence rapide pour {nom_de_la_catégorie} BlueSky Mast AL2 STANDARD Series. BlueSky Mast AL2 STANDARD Series 6 pages.

52
Adjust the 4 Primary Guy Ropes
2 ppl.
56
Lock the primary guy ropes by pulling a small amount of slack in. Use
your finger and loop the guy rope over the front lip of the guy handle.
Pull the guy handle towards the mast to remove any slack in the rope.
59
Confirm all 4 secondary guy ropes are at a 45 degree angle between the
primary guy ropes. Pull each of the secondary guy ropes out to it's fullest
distance, drive a stake into the ground and clip the guy rope to the stake.
61
OPTIONAL: Secure the winch and winch cable by removing the ball stop from the ball stop holder. Wind the free
cable onto the winch and secure the ball stop on the winch. Remove the handle and place it back into the wheeling
carry bag or hard case.
Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2015 BlueSky Mast, Inc. All Rights Reserved
Quick Reference Sheet - Primary and Secondary Guying
53
1
If the mast is leaning, Person #1
should go to the guy rope oppo-
site the way the mast is leaning.
AL2 Lift Series
DEPLOYMENT
54
75
2
2
Person #2 should go to the guy rope that is 90 degrees from person #1.
This will allow you to see how far each guy rope needs to be adjusted to
get the mast straight. Rotate to the other guy ropes to finish adjustment.
57
Drive two tripod stakes through two of the holes in the lift base plate.
60
Adjust, lock and secure the secondary guy ropes. Pull a small amount of slack in the rope and wrap it over the
rope lock on the front of the guy handle. Repeat this process until all 4 primary guy ropes have been adjusted
and locked.
Read Manual Before Use
Refer to detailed instructions in the
AL2 Lift Series Manual at all times
55
1
1
It may take a couple rotations to
get the mast straight and per-
pendicular.
58
Secure the 4 secondary guy
ropes at this time.