ACR STOVES Earlswood III Panduan Teknis - Halaman 11

Jelajahi secara online atau unduh pdf Panduan Teknis untuk Kompor ACR STOVES Earlswood III. ACR STOVES Earlswood III 17 halaman. Multifuel stove

ACR STOVES Earlswood III Panduan Teknis
To remove the internal vermiculite baffle:
Firstly remove the front fuel retaining
bars. Remove the fuel retaining bar
bracket bolts and brackets. Remove the
grate.
Then slightly lift the baffle and ease one
of the side bricks forward by pulling the
front edge of the side brick into the
combustion chamber. Remove the
Please tick boxes when each procedure is completed
Ensure the serial number has been recorded on the front of this manual for any
future use
Ensure the door seals are in good condition and that the glass is secured correctly
in the door (do not over tighten the glass as this will prohibit its expansion and
could cause the glass to crack)
Ensure that all internal components are fitted correctly (these may have shifted in
transit)
Ensure that the appliance operates correctly during the first firing
Ensure the customer is aware that fumes may be given off during the first firings
as the paint cures
Advise the customer on the safe operation of the appliance
Leave the instruction manuals, operating tool and glove for the customer's use.
Record the flue draught reading of the appliance

Commissioning Check List

second side brick in the same manner,
the vermiculite lower baffle can now be
removed by lowering the front edge and
rotating the baffle and removing through
the front door.
Lift the front edge of the upper steel
baffle and drop the back edge of the
steel baffle into the combustion
chamber, remove through door.