Coast to Coast Lucky Zone Manual - Halaman 16

Jelajahi secara online atau unduh pdf Manual untuk Mesin Game Arcade Coast to Coast Lucky Zone. Coast to Coast Lucky Zone 20 halaman.

Remarks: : : :
Please replace or power off then to restart the machine, the setting can be in effect if you
have reset the dial code
Hardware test process: : : :
Hardware test process
Hardware test process
Hardware test process
1、Lotteries machine test 2、Coins counter machine test 3、LED besides the door test
4、Turntable motor test
Please press hardware test button for next functional test each after you
finished a test.
10、 、 、 、 Resource
allocation List
allocation
allocation
allocation
Subdivision
Subdivision
Subdivision
Subdivision
Port No:
Port No:
Port No:
Port No:
Port No:
Port No:
Port No:
Port No:
IN0
IN1
IN2
IN3
JP1
JP1
JP1
JP1
IN4
IN5
IN6
IN7
IN8
IN9
IN10
IN11
JP2
JP2
JP2
JP2
IN12
IN13
IN14
IN15
IN16
IN17
IN18
IN19
JP3
JP3
JP3
JP3
IN20
IN21
IN22
IN23
( ( ( ( Table Three) ) ) )
5、Digital tube and LED around test
List
List
List
Programmer
Programmer
Programmer
Programmer
Direction
Direction
Direction
Direction
resource
resource
resource
resource
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
13
1 light win when Winning "?"bonus
ON
OFF
(Can be adjusted by dial code on
2 lights win when Winning "?"bonus
OFF
ON
(Can be adjusted by dial code on
3 lights win when Winning "?"bonus
OFF OFF
(Can be adjusted by dial code on
Sound test
6、
Usage instruction
Usage instruction
Usage instruction
Usage instruction
Coins inserting signal
Coin counter feed backing signal
Connect to ZH-090907A board 032
Connect to ZH-090907A board 033
Connect to ZH-090907A board 034
Connect to ZH-090907A board 035
Connect to ZH-090907A board 036
small PCB)
small PCB)
small PCB)
(Total 16)