Akuaplus SARAH SPB 9442BL Panduan Pengguna - Halaman 5
Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Perlengkapan Kamar Mandi Akuaplus SARAH SPB 9442BL. Akuaplus SARAH SPB 9442BL 10 halaman. Pressure balance shower panel
Recommended preparation of your wall / Préparation recommandée de votre mur
You will need to reinforce your wall with 2 x 6 inches pieces of wood as shown (2). To do this, place the shower panel against the wall at the
desired height (1) to measure and mark the position of the top bracket for the 2 x 6 (A), the bottom bracket position for the 2 x 6 (C), and the 2 x
6 position of the 90˚drop ear elbow (B). Use pipe nipples (E) and leave them 3/4 " (2cm) out from your final wall. Provide sufficient opening at
the back for easy access to connections for maintenance or repair.
Il vous faudra renforcer votre mur avec des pièces de bois de 2 x 6 po comme illustré (2). Pour ce faire, placez la colonne de douche contre le mur
à la hauteur désirée (1) afin de mesurer et marquer la position du 2 x 6 pour le support du haut (A), la position du 2 x 6 pour le support du bas
(C) et celui des raccords à oreilles à 90˚(B). Utilisez des mamelons de plomberie (E) qui devront ressortir de votre revêtement final de 3/4 po
(2cm). Prévoyez une ouverture suffisante à l'arrière pour faciliter l'accès aux raccordements en vue de l'entretien ou de la réparation.
1
A
B
C
2
Reinforcement piece
Pièce de renforcement
Not included
D
Non inclus
E
1/2" NPT
5