DAB ACTIVE JI 92 Instruksi Untuk Instalasi dan Pemeliharaan - Halaman 13

Jelajahi secara online atau unduh pdf Instruksi Untuk Instalasi dan Pemeliharaan untuk Pompa Air DAB ACTIVE JI 92. DAB ACTIVE JI 92 20 halaman.

DAB ACTIVE JI 92 Instruksi Untuk Instalasi dan Pemeliharaan
1
2
The operations, described below, for changing the electronic card must be carried out
exclusively by specialised, qualified personnel:
− Reduce the system pressure (it is recommended to close the valve of the system, located for
this purpose on delivery, near the pump ).
− Disconnect the electric connectors of the card.
− Unscrew the 4 screws of the card, keeping it pressed.
− Turn the card towards the outside.
− Pull the card upwards, keeping it tilted.
− Pay attention to the OR of the pressure probe!!!
(pressure probe: card connecting tube with a hydraulic body )
ENGLISH
Changing the electronic card
Fig. 14
It is recommended to use a straight length of pipe,
after delivery, for lifting the cover of the Active system,
in the event of inspection .
27
Male Faston outlets for
remote alarm signal