DoorKing 1610 Panduan Instalasi - Halaman 7

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Sistem Kontrol DoorKing 1610. DoorKing 1610 14 halaman. Traffic control spikes

5a
Position the Spike system on the concrete blocks.
PLACE SPIKES ON
CONCRETE BLOCKS
SPIKES FLUSH
WITH ROADWAY
SOIL
CONCRETE BLOCK & GRAVEL
Confirm spike system
lays
flush
roadway before pouring
concrete.
1610-065-E-03-06
4
Load gravel inside the trench up to the concrete
block surface.
The
help the drainage
process and avoid
soil run-off.
CONCRETE
with
the
fl ush spike installation / fl ush spikes
gravel
will
5b
Pour concrete around
the Spike system.
CONCRETE SECURES
SPIKES IN PLACE
2
GRAVEL
installation guide 7