Astrapool Dual Pure 100 Manual - Halaman 7
Jelajahi secara online atau unduh pdf Manual untuk Peralatan Pencahayaan Astrapool Dual Pure 100. Astrapool Dual Pure 100 20 halaman. Salt electrolysis and ph regulation
ELECTRICAL CONNECTIONS:
-
The powder supply to the unit: The system works in parallel with the filtration pump. It is
imperative that it functions at the same time as the filtration.
The connection is made via the contactors on the filtration pump in the filtration unit. A unit
that is permanently connected will lose its warranty.
1
3
5
Override
2
4
6
Mono 220 V
-
The power of the salt electrode: connect the cable supplied for this purpose. The connection
may be made in either direction. Tighten the screws correctly. A badly tightened connection
will result in overheating.
-
Probe connection cable: Connect the BNC plug of the cable to the socket located below the
system.
-
Flow Switch: connect the cable to the socket located under the system.
Diagram of an electrical connection (example only):
Clock
1 3 5 I3 A1
Contactor
2 4 6 I4 A2
Circuit breaker
Automatic
Pump
4A-AM
A.
7
Número de revisión
ENGLISH
Rev 001-2013-08-06