Cold Jet PE80 Pra-Instalasi - Halaman 10

Jelajahi secara online atau unduh pdf Pra-Instalasi untuk Peralatan Industri Cold Jet PE80. Cold Jet PE80 16 halaman. Dry ice manufacturing system – pelletizers

The customer is responsible for the electrical installation of the pelletizer. This includes the power cable and main circuit
breaker which meet the specifications below. The main circuit must be suitable for proper lock out / tag out in
accordance with international and national standards and requirements.
Electrical Service & Supply
Voltage AC/ Frequency (EU 50Hz)
Average Power Consumption
Rated Current (Imax)

REPAIR AND WARRANTY

Repair

The repair/replacement of the following parts can be made by the owner's qualified personnel:
Filter for the liquid CO
Degassing filter on the extruder
Piston on the extruder
When making repairs/replacements, use only original Cold Jet spare parts.

MAINTENANCE

Cleaning the PE50/80
The following steps are necessary when the PE50/80 needs to be cleaned.
Disconnect the power.
Protect all electronic equipment.
clean by means of a wiper moistened with a cleaning material (degreaser) suitable for stainless steel.
Do not pressure wash.
2
Preinstallation manual
PE50
3 x 400 VAC/50Hz
PE50 & PE80
PE80
3 kW
16 A
Version:
Page:
Date:
1
9 of 15
22.02.2023