CANTERBURY AGORA Z2328-45IN Panduan Memulai Cepat - Halaman 8

Jelajahi secara online atau unduh pdf Panduan Memulai Cepat untuk Perlengkapan Kamar Mandi CANTERBURY AGORA Z2328-45IN. CANTERBURY AGORA Z2328-45IN 14 halaman. Basin mixer with automatic pop-up waste

Installation Instructions
 Install the vertical waste pop-up rod 20, by
feeding it through the hole in the top of the
tap body.
 Feed the bottom end of the vertical pop-up
rod onto the articulated joint 21, located
on the horizontal waste pop-up rod.
 Adjust the length of the vertical pop-up rod
to ensure the proper working of the pop-up
stopper.
 Ensure that the locking screw on the
articulated joint is firmly secured.
Before use
Turn on the Hot and Cold supplies to the tap.
Maximum temperature for Hot water supply to the tapware is 62 °C.
Minimum recommended pressure is 100 kPa — Maximum recommended pressure is 500 kPa.
Check the installation carefully for leaks.
If further building work is to be carried out in the vicinity of the tapware, it should be covered to
prevent paint, adhesive, etc. from damaging the surface.
Further information Phone (03) 9761 4603
8
Model : Z2328--45IN