COMAC C-100 One Panduan Memulai Cepat
Jelajahi secara online atau unduh pdf Panduan Memulai Cepat untuk Pengering COMAC C-100 One. COMAC C-100 One 2 halaman.

Installation must be performed by qualified personnel. Hand
dryer must be grounded.
• Remove the two tamper-proof cover attachment screws using
the supplied key. Gently pry the cover from the wallplate with a
screw-driver inserted in the slot at the bottom back of the dryer.
• Unplug the power cable from Ahe circuit board. Remove
the four screws that pass through the rubber grommets and
remove the mechanism from the wallplate. Remove the over
from the electrical junction box on the wallplate by loosening
the single screw.
• Use the chart below to determine the correct height of the
wallplate. When two or more dryers are installed, they should
be placed no closer than 60cm (24") from center to center. Mark
the location of the four mounting holes.
• All dryers must be fed by two power conductors and one
ground wire. For wall wiring, remove the electrical knockout
from the wallplate and mark the location of the wire entry.
Carry the electrical wire to the dryer and attach it to the wallplate
knockout using an approved connector.
• Attach the wallplate firmly to the wall. For wood walls or wood
studs, use No. 16 screws of proper length to ensure 25 mm (1")
minimum stud penetration. For masonry walls use expansion bolts
or anchors for 6mm (1/4") screws of proper length to ensure
penetration 6mm (1/4") deeper than anchor. Shim if necessary
to ensure that the wallplate is level and flat against the wall.
• For surface wiring, remove the knockouts from the dryer cover
and the electrical junction box and bring the conduit to the dryer
Tell: +1 (855) 550 0303
Tell :+1 (450) 432 5946
Fax: +1 (450) 432 8910
2-25 BOUL MAISONNEUVE
Saint-Jérôme QC J5L 0A1
www.comaccorporation.com
INSTALLATION
from below. Attach the conduit to the junction box using an
approved connector.
• Connect the two power leads to the power cable using the
supplied wire nuts. Attach the ground wire securely to the
ground screw on the wallplate. Replace the junction box cover
and tighten the screw.
• Reinstall the mechanism and replace the four mechanism
mounting screws. Plug the power cable into the circuit board
and push firmly until it is fully seated.
• Replace the dryer cover. Slide the cover onto the wallplate
horizon-tally and then upward while continuing to push the
bottom of the cover towards the wall. The cover should hook
at the top and click into place at the bottom. Replace the
two tamper-proof screws, taking care notto cross-thread or
over-tighten them.
USE AND CARE
• Regularly clean exterior surfaces and wash with mild soap.
• Remove accumulated dust from air inlet areas.
• Ensure that infrared sensor lens is clean and unobstructed.
Once per year, or more frequently if dryer is installed in a dusty,
greasy, or heavy use environment:
• Remove tamperproof screws and slide cover downward and
away from wall at the bottom to remove.
• Disconnect power plug. Caution: do not touch exposed wires.
• Gently remove accumulated dust from mechanism and fan
blades with a vacuum. Inspect for worn or damaged parts.
• Replace power plug and reinstall cover as described above.
Distance from
bottom edge of dryer to floor:
Men
Women
44" (112 cm)
Children 8-10 Years
Children 11-13 Years
Children 14-16 Years
44" (112 cm)
Disabled
47" (119 cm)
35" (89 cm)
38" (97 cm)
36" (91 cm)