步骤10: ② ③绝缘筒插入到①屏蔽壳组件, 并使其触底,带高压互锁绝缘筒②装入位置B,不带高压互锁的绝缘
筒③装入位置A 与C,注意确认HVIL位置以及卡簧是否到位。
Step 10: Plug the ② ③ Insulation sleeve into ①Shield shell assembly , and make it reach the bottom.
Insulation sleeve with HVIL ② is in the position B,and Insulation sleeve without HVIL ③ is in the position A
and C. take care to ensure HVIL in right place and pull back wire to ensure clamp spring is in position.
HVIL端子不能
损伤变形,请
注意插入方向
HVIL terminal
cannot be
damaged or
deformed
Take care of
sleeve plug
direction
装到底后轻摇线材使卡簧到位
再后拉线材应不松脱
After installation, gently shake
the wire to ensure the spring in
place, pull back wire should not
be pulled out.
步骤11:将 ⑩金属垫圈和⑪密封圈推入屏蔽壳组件内部的底部,接着将⑫尾盖扣住①屏蔽壳组件,完成此端线
束的组装
Step 11: Push the ⑩ metal gasket and ⑪ sealing to the bottom of Shield shell assembly,and then make the
⑫ end cap fasten the ① shield shell assembly to finish the assembly.
操作到位的效果图
The effect of
operation in place
⑪ Sealing
密封圈
步骤12:在线缆组装好后需要做绝缘电阻和耐压测试,建议客户参考下面的测试参数
Step 12: Need to do the Insulation Resistance and DWV test after cable assembly, It is recommended that
the customer refer to the following test parameters
12-1 绝缘电阻测试
12-1 Insulation Resistance .
Positions
位置
Cable(power) to shell
电缆芯线到壳体
Cable(power) to HVIL
电缆芯线到高压互锁
HVIL to shell
高压互锁到壳体
Rev.05 20211123 Document No: 8P1092
三芯2代直头组装式连接器安装说明The Assembly
Test voltage(DC)
测试电压(直流)
1000 V
1000 V
1000 V
Manual
依次将装好③与②绝缘筒的线材装入到①屏蔽壳组件
Assemble wire assy with insulation sleeve
assembly
PinC, PinB and PinA
测试时间(推荐)
Test Time(recommended)
for 3POS PowerLok G2 180D Plug Connector
② or ③ into ①Shield shell
in sequence.
.
Insulation resistance
5S
5S
1S
⑫ End Cap
尾盖
绝缘电阻
> 500 MΩ
> 500 MΩ
> 100 MΩ