Dover PSG Mouvex AZ O Pengoperasian & Pemeliharaan Instalasi - Halaman 9

Jelajahi secara online atau unduh pdf Pengoperasian & Pemeliharaan Instalasi untuk Pompa Air Dover PSG Mouvex AZ O. Dover PSG Mouvex AZ O 19 halaman.

Dover PSG Mouvex AZ O Pengoperasian & Pemeliharaan Instalasi
THE CYLINDER/PISTON AND BUSHINGS (continued)
WARNING
The weight ot the parts
can be dangerous and
may provoke bodily inju-
ries
or material damages.

4.1 Necessary tools

• 7 - 8 - 30 open-end spanner
• 19 socket spanner
• adjustable spanner
• 1 plastic mallet
• 1 flat screwdriver
• 1 tube for assembling the bearings

4.2 Disassembly for inspection

4.2.1 To remove front cover
Remove front cover screws 410.
Remove the front cover 401 by progressively separating
it from the pump body and with it the piston 301, the
shaft and the mechanical seal (shaft part).
NT 1003-A00 09 18 AZ O e
4. OPENING THE PUMP TO INSPECT
BE CAREFUL WITH THE WEIGHT OF
THE PARTS WHEN THEY ARE BEING
REMOVED.
4.2.2 To remove piston
Remove the piston 301 by pulling it along the shaft 501.
4.2.3 To remove mechanical seal and shaft
Remove the mechanical seal and the shaft by following
the directions § MECHANICAL SEAL.

4.3 Reassembly

Reassembly is done in the reverse order than the dis-
mantling.
Take the following precautions :
• Check the condition of the mechanical seal (see §
MECHANICAL SEAL).
• Check the condition of the spring 504 and the piston
bearing (mini length in the rest : 13,5 mm). Light load
must be applied to the spring in order to insert the
piston 301 into the cylinder 201.
• Check also that the piston backsprings 310 (mini
length in the rest : 22,5 mm).
• Before refitting the front cover 401, do not forget to
refit the front cover seal 403 after making sure it is in
good condition.
9/19