2.OO installation (continued)
2.O3 Peripheral Elements
After placing the unit, it is necessary to hang the distributor that directs dosages to the washers:
•
This distributor is responsible for diverting the products to the corresponding washer extractor.
•
Only one machine is attended while the others are queued.
•
It is recommend to set the distributor at an equidistant position from the washer extractors.
2.O4 Tubing
Once all elements are on the wall, their fittings must be
connected with the tubes. We recommend using 1/2 inch
or 12mm reinforced tubing.
Water Inlet: Make sure there is enough water supply for
the unit; at least 40 psi or 2.8 bar in the dynamic range.
If that water pressure cannot be achieved, it is mandatory
to install a booster tank to increase the incoming water
pressure to the EvoClean.
Chemical Pickup: Decide the best distribution for the
tanks / drums of product.
After that, connect all tubes from the EvoClean to the
suction lances.
Inlet Valve 1 = Flush vent
Inlet Valve 2 = Product 1
Inlet Valve 3 = Product 2
Inlet Valve 4 = Product 3
Inlet Valve 5 = Product 4
Inlet Valve 6 = Product 5
Inlet Valve 7 = Product 6
Inlet Valve 8 = Product 7
Inlet Valve 9 = Product 8
Do not connect any tubes to the Flush channel
vent fitting! This must remain unobstructed.
The product check valves are supplied detached in a bag
with the unit. To prevent damage to the dispenser,
install hoses to the check valves before connecting
the check valves to the manifold! Push the product
intake hose onto the detached check valve and secure with
cable tie, then push the check valve elbow into the eductor
and secure with the clip.
Distributor Tubing: Install the delivery tubing from the
main panel to the distributor inlet and connect each
distributor delivery tube to the appropriate washer, as
shown to the right.
Distributor Valve 1 = Machine 1
Distributor Valve 2 = Machine 2
Distributor Valve 3 = Machine 3
Water
P1
Connect nothing
to the Flush channel
vent fitting! Must be
unobstructed.
EvoClean with all Check Valves installed
F
1
2
3
Valves
1
2
Machine 1
to
Distributor
Inlet
to
Distributor
P2
P5
P3
P6
P4
P7
P8
Products
(1/2" or 12mm Tubing)
Chemical Drum
Check Valves
4
3
Delivery from
Main Panel
5