Follett HMD1000RBT Panduan Petunjuk Instalasi - Halaman 6
Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Pembuat Es Follett HMD1000RBT. Follett HMD1000RBT 17 halaman. For ice storage bin top-mount applications
Prepare the bin.
3.1
Bin top preparation
• Remove protective tape from
gaskets
6
Bin preparation
3.2
Bin top preparation
➊
• Apply gaskets
• Install shuttle actuator
and secure with locking nut
remote condensing
3
➋
➊
➌
➊
➋
through bin top
➌
BIN • TOP-MOUNT