Follett HMD1650RBT Panduan Petunjuk Instalasi - Halaman 5
Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Pembuat Es Follett HMD1650RBT. Follett HMD1650RBT 17 halaman. For ice storage bin top-mount applications
Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation is
not recommended and will void warranty.
2.1
2.1
Installation site requirements
➊
Electrical
120/60/1-6 amps
Potable water supply
• 10-70 psi (69-483kpa)
• 45-90 F (7-32 C)
• Follett recommends the use of an in-line water fi ltration system (item# 00130286)
➌
Drain
• The drain line from the ice machine must have at least 1/4" per foot pitch (6,4mm/.3m)
➍
Refrigeration lines
• 1000, 1400: 5/8" (15,8mm) diameter suction (insulated)
• 1650: 7/8" (22,2mm) diameter suction (insulated)
• 3/8" (9,5mm) liquid
BIN • TOP-MOUNT
208264
Stock Module Identification Plate
Module No.
Product
Service No.
➋
➎
remote condensing
➎
3/8" ∅ (9,5mm)
➍
➊
➋
1'
➌
1/4"
➍
➍
Site preparation
NEMA
5-15
2
5