Follett Horizon Elite 1810 Series Panduan Petunjuk Instalasi - Halaman 5
Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Pembuat Es Follett Horizon Elite 1810 Series. Follett Horizon Elite 1810 Series 17 halaman. Ice machine models with ride technology
Juga untuk Follett Horizon Elite 1810 Series: Panduan Petunjuk Instalasi (13 halaman), Panduan Memulai Cepat (8 halaman), Manual (8 halaman)
Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation of
low side is not recommended and will void warranty.
2.1
2.1
Installation site requirements
Electrical
➊
• 120/60/1-5 amps
Potable water supply
• 10-70 psi (69-483kpa)
• 45-90 F (7-32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable
federal, state, and local codes
Drains:
➌
3/4" Barb for silicone drain, 3/8" push-to-connect for chassis drain
• Minimum 8" radius on silicone drain line. Drain line from the ice machine must have at least
1/4" per foot pitch (6,4mm/0,3m).
➍
Refrigeration lines
• 7/8" ∅ (22,4 mm) diameter suction line (insulated)
• 3/8" ∅ (9,5 mm) liquid line
DROP-IN • RIDE Technology
➋
(3/8" push-in internal connection, 3/8" OD tubing required)
➎
remote condensing
Site preparation
➍
7/8" ∅ (22,4mm)
➎
3/8" ∅ (9,5mm)
➌
chassis
drain must
be used
➊
NEMA
5-15
➋
1/4" per foot
(6,4 mm per 0,3 m)
➌
➍
2
3/8"
2 ft. x 1" OD
silicone tubing
and ttings
provided
5