Follett Horizon Elite Chewblet HCD1010NBS Panduan Petunjuk Instalasi - Halaman 12
Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Pembuat Es Follett Horizon Elite Chewblet HCD1010NBS. Follett Horizon Elite Chewblet HCD1010NBS 16 halaman. For drop-ins
Juga untuk Follett Horizon Elite Chewblet HCD1010NBS: Manual (8 halaman), Panduan Petunjuk Instalasi (17 halaman), Manual (8 halaman)
Install front cover to ice machine.
8.1
Install condensing unit
• Complete installation of condensing unit
or connection to rack system.
• Required rack system capacity at 0 F
(–18 C) evaporator (EPR supplied by
installer).
1010N: 7,700 Btu/hr (1940 kcal/hr)
1410N: 10,000 Btu/hr (2519 kcal/hr)
Consult Operation and Service Manual provided with ice machine for sanitizing instructions.
12
NOTICE
Ice machine MUST be sanitized prior to operation!
remote condensing
Front cover
8.2
Install ice machine front cover
➋
• Slide ice machine cover over machine
• Insert and tighten two screws through
cover and into docking assembly
BIN • RIDE Technology
8
➊
➊
➋