Follett Horizon Elite Chewblet HCD1010NMS Panduan Petunjuk Instalasi - Halaman 5
Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Pembuat Es Follett Horizon Elite Chewblet HCD1010NMS. Follett Horizon Elite Chewblet HCD1010NMS 16 halaman. Ice machine with ride technology installation instructions for ice manager diverter valve
Juga untuk Follett Horizon Elite Chewblet HCD1010NMS: Manual (8 halaman), Panduan Petunjuk Instalasi (17 halaman), Manual (8 halaman)
Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation is
not recommended and will void warranty.
2.1
2.1
Installation site requirements
Electrical
➊
• 120/60/1-5 amps
Potable water supply
• 10-70 psi (69-483kpa)
• 45-90 F (7-32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable
federal, state, and local codes
Drain
➌
(3/4" MPT)
• The drain line from the ice machine must have at least 1/4" per foot pitch (6,4 mm/0,3 m)
Refrigeration lines
➍
• 5/8" ∅ (15,8 mm) diameter suction line (insulated)
• 3/8" ∅ (9,5 mm) liquid line
ICE MANAGER
1/4" per foot
(6,4 mm per 0,3 m)
➋
(3/8" push-in internal connection, 3/8" OD tubing required)
➎
remote condensing
➋
➋
➌
1'
➍
Site preparation
NEMA
➊
5-15
➎
3/8" ∅ (9,5mm)
➍
5/8" ∅ (15,8 mm)
2
5