Follett Horizon Elite H E1410ABT Series Panduan Petunjuk Instalasi - Halaman 7

Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Pembuat Es Follett Horizon Elite H E1410ABT Series. Follett Horizon Elite H E1410ABT Series 16 halaman.

Follett Horizon Elite H E1410ABT Series Panduan Petunjuk Instalasi
4.

External Connections

4.1

Ice Transport Tube Installation

§ Install supplied ice transport tube insulation.
§ Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
connection to ease assembly.
§ Connect ice transport tube to coupling on docking station
§ Connect ice transport tube to shuttle actuator
BIN • TOP-MOUNT
.
.
Horizon 710/1010/1410
Hot Water
160 F (71 C)
before making
7