Downee Spring Gate Instal Manual - Halaman 7

Jelajahi secara online atau unduh pdf Instal Manual untuk Pagar & Gerbang Downee Spring Gate. Downee Spring Gate 14 halaman. Double gates

BATTERY BOX

NOTE
Post Brackets are not supplied with Sprint
Gate Kits. Two pieces of angle will do.
1.
Work out where the Battery Box will sit above Motor One.
2.
Start with the bottom Post Bracket and mount it
to Gate Post.
3.
Attach the other angle bracket to the top
mount on the battery box. Sit the Box on
the bottom angle and attach the top angle
to the Gate Post.
4.
Use the key to open the box and remove the foam blocks.
SOLAR PANEL POST
NOTE
Steel Post Cap not supplied in this kit. Measure the
diameter of your gate post to match a Post Cap.
TIP
Position the bolt holes east-west for the solar panel to face north. Not
sure which direction north sits? Download a free compass app onto
your smart phone.
Keep the carton containing the solar panel in good condition. You'll
need it a bit later.
1.
Drill a hole in the centre of the post cap and bolt it
onto the Panel Post.
2.
Place the Cap & Post onto the top of the gate post.
It may be a tight and may need some gentle
encouragement with a hammer. Keep it in place
with self tappers or tek screws.
4