Follett Horizon series Panduan Petunjuk Instalasi - Halaman 13
Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Pembuat Es Follett Horizon series. Follett Horizon series 17 halaman. For ice manager diverter valve
Long tube run recommendations
➊
max. 2 ft (.6m)
➋
1/4"
1'
➊
• Pitch ice transport tube to allow melt water to drain towards ice machine
➋
• Secure insulated ice transport tube at least every 2 ft (.6m) to prevent dips or traps
ICE MANAGER
remote condensing
13