Misuse or improper application of the product.
•
Placement of the product in a location or in a manner which is not contained in this manual.
•
Improper installation or products installed in a manner which does not follow the installation instructions contained in this manual.
•
Any installation not performed by a licenced Mechanical, HVAC or Electrical contractor.
•
Use of replacement parts not manufactured or supplied by Advanced Air.
RISK OF ELECTRIC SHOCK! Disconnect power at breaker or fuse panel before installing this device or performing any service/replacement of parts. Also, disconnect
*Always follow OHSA electrical lockout safety requirements to prevent accidental exposure to electrical energy during installation or service/repair.
•
Keep all wires away from the carbon fibre brushes, allowing at least one inch (2") of spacing between the carbon fibre brushes and anything metal or grounded.
•
Never touch the ion needles or carbon brushes while operating.
•
Only install this product in a dry location away from water or moisture. Only install this product indoors on a metal surface in an HVAC handler or duct, and away from
extreme heat or cold.
WARNING: Do not connect to power before installation is complete.
1. Mount the BiPolar Ionization unit downstream of the filter and before
the cooling/heating coil. For best results avoid locations directly
downstream of the cooling/heating coil or humidifier.
2. Mount the BiPolar unit at or near the fan inlet on a metal surface in the
air handler or internal wall duct ensuring the airstream flows over the
two brushes simultaneously. See Figure 1
3. Attach using the magnet provided to a metal surface. If mounting the
unit on the fan housing, ensure the unit is secured well from fan vibration.
If mounting using screws, (not included) in applications where there is high
velocity air streams or excessive vibration, use self tapping short length
screws, so they do not impair fan operation or cause damage to equipment.
4. The tips of the carbon brushes should be at least 2" away from any
metallic or grounded object.
WARNING: Do not connect to power before installation is complete. Always
disconnect power from the unit before handling the ionizer.
1. All field wiring to be done in accordance with NEC and Authorities Having
Jurisdiction (AHJ).
2. Connect power to the BiPolar Ionizer using appropriate voltage of 24V AC.
See Figure 2.
3. Wires: RED: Positive / Hot ; BLACK: Negative
4. For best results, interlock the BiPolar Ionizer with fan power.
5. Keep power wires away from tips of the units brushes.
6. Apply power to unit. Green light indicates the ionizer is functioning properly.
1. When power is supplied to the ionizer, the green power/operation light will illuminate indicating the ionizer is active and working.
2. The BiPolar ionizer is self balancing and does not require any adjustments.
Phoenix, AZ USA
Phone: 602-975-8396
Email: [email protected]
www.AirMadeBetter.com
SAFETY WARNINGS
Manufacturer is not responsible for any issues, injuries or damages caused as a result of:
power to the unit before performing any service, maintenance or parts replacement.
MECHANICAL INSTALLATION
ELECTRICAL INSTALLATION
OPERATION
SPECIFICATIONS
Model
Voltage Current
24VAC
ID-200
© 2022 Advanced Air
DISCLAIMER
CAUTION
WARNING
FIGURE 1
Hardware Provided: 1-BiPolar Ionization unit | 1-Securing Magnet | 1 - 500mA Fuse.
Hardware Required by Installer: Electrical Connectors | Mounting Screws (if needed)
FIGURE 2
POWER LED
—
+
EMMITER BRUSHES
Red: + ions
Black: - ions
Airflow
Fuse
Capacity
10mA
500mA
2000cfm
Page 2 of 2
IN LINE
500mA FUSE
E521171
CONFORMS TO:
•
UL STANDARD 867
•
UL STANDARD 2998
•
CSA STANDARD
C22.2 No 187-M1986
•
RoHS Directive (EU) 2015/863
•
REACH
BLACK - 24V AC
Negative Wire
(—)
+
(
)
RED - 24V AC
Positive / Hot Wire
EPA
Est. Reg. No.
99880-CHN-1
Made in China