Dr. Mach MACH 120 Series Petunjuk Pemasangan, Petunjuk Penggunaan

Wall attachment Mach 120/130

Mach LED 120/130
Note:
The static (structural) inspection must be carried out before the installation of the
ceiling or wall anchorage!
The strength of the construction must be designed, checked and certified by a structural
-
engineer.
The respective regional construction regulations that apply must be followed.
-
If a wrong hole is drilled by mistake, e.g. drilling of a reinforcement rod, the structural
-
engineer who is responsible must be contacted, since adequate static load distribution in the
ceiling may have been endangered.
Declaration of acceptance:
It is hereby certified that the supporting ceiling / wall and the ceiling anchoring / wall anchoring
is safe and adequately strong.
Project
: ____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Anchoring
(please check the one that is applicable)
with dowels authorized by construction authority
-
with counter-plate
-
other
-
Location
: ____________________________________________
Signature / Stamp: (structural engineer / construction authority)
59860002
Static inspection
Edition 11
Dr. Mach
Lamps and Engineering