AirStage AJH054LBLAH Panduan Instalasi - Halaman 17

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Pendingin Udara AirStage AJH054LBLAH. AirStage AJH054LBLAH 19 halaman. Outdoor unit

AirStage AJH054LBLAH Panduan Instalasi
(1) Calculation of additional amount for pipe length
Total length of ø 9.52
mm liquid pipe
a × 0.058
(kg/m)
A =
m
Total
=
(2) Calculation of total refrigerant amount
C = A+B =
NOTE:
Check the total refrigerant amount under the following conditions
Condition
Total amount of refrigerant
<Calculation>
Outdoor unit: AJ*054LBLAH
(1) Calculation of additional amount for outdoor unit
If liquid pipe piping length is the following
Ø 9.52 mm: 50 m, Ø 6.35 mm: 35 m
Additional charge volume:
A = 50 m × 0.058 kg/m +35 m × 0.021 kg/m = 3.635 kg ≈ 3.64 kg
(2) Check the total amount of refrigerant
C = A + B = 3.64 kg + 5.30 kg = 8.94 kg ≤ 15.7 kg
→No problem if the above condition is satisfi ed.

8.4. Installing insulation

• Install insulation material after conducting the "8.1 Sealing test".
• To prevent condensation and water droplets, install insulation material on the refrigerant
pipe.
• Refer to the table to determine the thickness of the insulation material.
• If the outdoor unit is installed at a level that is higher than the indoor unit, the water that
has condensed in the 3-way valve of the outdoor unit could travel to the indoor unit.
Therefore, use putty in the space between the pipe and the insulation to prevent the
entry of water.
Table. Selection of insulation
(Use an insulation material with equal heat transmission rate or below 0.040 W/(m·k))
Insulation material minimum thickness (mm)
Relative humidity
≤ 70%
Pipe diameter
6.35
8
(mm)
9.52
9
12.70
10
15.88
10
19.05)
10
* When an ambient temperature and relative humidity exceed 32 °C, please strengthen
heat insulation of refrigerant pipe.

8.5. Filling with putty

Fill the piping holes and wiring holes with putty (supplied locally) to avoid any gap (Fig A).
If small animals such as insects enter the external unit, a short circuit may be caused
near electrical components in the service panel.
If the outdoor unit is installed at a level that
is higher than the indoor unit, the water that
has condensed in the 3-way valve of the
outdoor unit could travel to the indoor unit.
Therefore, use putty in the space between
the pipe and the insulation to prevent the
entry of water to the indoor units.

9. TEST RUN

9.1. Indoor unit connection check

Normal operation will not be possible without performing the Indoor unit connection check.
9.1.1 Things to confi rm before starting the Indoor unit connection
check
To ensure safety, check that the following work, inspections and operations have been
completed.
Total length of ø 6.35
mm liquid pipe
a × 0.021
+
m
kg
(Round up A to 2 decimal place)
kg
(B : Factory charged amount)
kg
Computational formula
C ≤ 15.7 kg
≤ 75%
≤ 80%
10
13
11
14
12
15
12
16
13
16
WARNING
Fig. A
Putty
1 Check that all work on the wiring connecting the outdoor
unit and indoor units has been completed.
(kg/m)
2 Is a breaker installed at the power supply cable of outdoor
unit and every indoor units?
3 Are the cables connected to the terminals without loose-
kg
ness, and in accordance with the specifi cations?
4 Are all the indoor units stopped? Indoor unit connection
check can not be performed if any unit is operating.
5 Is the connection to Service tool (UTY-ASGX) and Web
monitoring tool (UTY-AMGX) stopped?
9.1.2 Operating procedure for Indoor unit connection check
Please perform the indoor unit connection check according to following procedures.
The Indoor unit connection check can be completed within several minutes.
Turn on the power of indoor
unit and outdoor unit.
LED105
LED104
≤ 85%
17
18
19
20
21
Insulation
Check Item
: Press the "MODE/EXIT" button
: Press the "SELECT" button
: Press the "ENTER" button.
: Press the "ENTER" button for more
than 3 seconds.
Set to Function mode [F3].
(When [F4] to [F9] are displayed, continue to
press the "SELECT" button until [F3] is dis-
played.)
Press the "SELECT" button until "12" is displayed.
Press the "ENTER" button for more than 3 sec-
onds.
When indoor unit connection
check can not be performed
This will be displayed when the Indoor unit connection
check starts.
(*1)
Confi rm the number of connected indoor units and the
volume ratio of the indoor units connection.
(*1) The number of connected indoor units
Ex.) When 8 units are connected
(*2)
(*2) Volume ratio of the indoor units con-
nection
Ex.) When the ratio is 120%
Exit indoor unit connection check mode.
When error occurs
Please refer to the following "Error displays"
for details.
When it fi nishes normally, nothing will be displayed on
7 segment display.
Check Column
En-16