Draper Luma Petunjuk
Jelajahi secara online atau unduh pdf Petunjuk untuk Layar Proyeksi Draper Luma. Draper Luma 2 halaman. Spring-roller operated projection screen that can be wall or ceiling mounted
Juga untuk Draper Luma: Brosur (16 halaman)
Luma
Spring-roller operated projection screen that can be wall or ceiling mounted
Wall or Ceiling
Mounting Bracket
Dowel
Section 1 - Installation
1. Your Draper screen can be mounted on a wall or suspended from the ceiling or extension brackets.
It must be mounted level and with the flat back parallel to the wall.
The screen (or extension brackets) should be mounted into studs or blocking in the wall/ceiling, or
in drywall (minimum thickness ½") with specified anchors. For any other type of installation, follow
all local building and safety codes.
Steel studs, concrete or cinder block walls and all other types of non-wood frame construction
require the use of special screws or anchors.
The selection of appropriate mounting hardware should be made by a qualified professional installer.
Viewing
Surface
INSTRUCTIONS
INSTALLATION & OPERATION
CAUTION
1.
Read and understand these instructions; keep them for
future reference. Follow instructions carefully. Failure to do
so invalidates warranty.
2.
Care in both mounting and correct operation will mean long
and satisfactory service from your Draper screen.
3.
Locate the screen where the audience can best see it, and
where other room furnishings permit.
4.
Mount the screen so that the bottom of the picture, when
screen is fully extended, will be above the heads of viewers.
5.
When raising screen, pull down and, while holding, allow
for slow retraction into the case to reduce risk of injury from
falling screen.
6.
Screen should be installed level (using a carpenter's level).
7.
Nothing should be fastened to screen dowel or viewing
surface.
Please Note:
Custom products/installations may not be reflected
by this document. Call Draper, Inc. if you have questions about
your installation.
Draper, Inc. | 411 S. Pearl St. Spiceland, IN 47385
draperinc.com | 765.987.7999 | 800.238.7999
© 2017 All Rights Reserved
TOOLS
REQUIRED
Pencil
Tape Measure
Level
Power Drill
Hardware
(by Others)
|
FORM: Luma_Inst17