Draper Targa Petunjuk Manual - Halaman 2

Jelajahi secara online atau unduh pdf Petunjuk Manual untuk Layar Proyeksi Draper Targa. Draper Targa 8 halaman. Electrically operated projection screen with motor-in-roller
Juga untuk Draper Targa: Petunjuk Pemasangan & Pengoperasian (4 halaman), Petunjuk Pemasangan & Pengoperasian (2 halaman), Petunjuk Pemasangan & Pengoperasian (2 halaman), Petunjuk Pemasangan & Pengoperasian (2 halaman), Petunjuk Pemasangan & Pengoperasian (4 halaman), Petunjuk Pemasangan & Pengoperasian (2 halaman), Petunjuk Pemasangan & Pengoperasian (3 halaman), Petunjuk Instalasi dan Pengoperasian (4 halaman), Petunjuk Pemasangan & Pengoperasian (2 halaman), Petunjuk Pemasangan & Pengoperasian (2 halaman)

Draper Targa Petunjuk Manual
Targa

Section 1 - Electrical Connections

CAUTION: All operating switches should be "off" before power is connected. Plug-in power cord option available with built-in low-voltage motor.
Screen operates on 110-120V, 60 Hz., 1.1 Amp current draw. Duty cycle: On 28 seconds/Off 4 minutes.
Junction box is located inside left endcap and cover plate secures to endcap with two screws which may be removed with star key or small flat head screwdriver. Junction
box contains red, black, and white pigtail leads and green internal ground wire, per wiring diagram.
Screen ships complete with internal wiring. Control switch
supply furnished by installer.
Please Note: Screen must be installed in accordance with the requirements of the Local Building Codes, the Canadian Electrical Code
Electric Code
, NFPA 70. An appropriate disconnect device shall be provided as part of the building installation.
(NEC)
Please Note: Do NOT wire motors in parallel.

Section 2 - Operation

CAUTION: When operating for the first time, cycle unit down and up several times to confirm satisfactory operation. Be prepared to cut POWER if necessary.
110-120V SINGLE STATION CONTROL - 3-position UP-OFF-DOWN
switch permits operation to be stopped at any point. Factory adjusted
limit switches automatically stop screen when fully down or fully up.
24V CONTROL
(optional and requires optional LVC-IV)
STOP-DOWN switches stop at any point desired and operate in any
sequence. Factory adjusted limit switches automatically stop screen
when fully up or fully down. Installer should incorporate an all-pole
disconnect in fixed wiring available with RF or IR remote.
RS232 / ETHERNET - Serial communication and network
communication optionally available.

PLEASE READ - Safety Information

Important Safety Information
Improper installation and use of the Targa Projection Screen can result in serious injury or death. Primarily, injuries can occur if the unit falls due to imprecise
installation, mishandling of the unit during installation, or installation on an insufficient wall or ceiling structure. Please use extreme care.
1. Please read the following installation guidelines thoroughly and follow them
carefully. Failure to do so may cause product to fall or otherwise fail, and could
result in serious injury.
2. Installation and calibration of the unit should only be performed by an authorized,
qualified, and experienced professional. In particular, electrical work and wiring
[indicated in diagram by dashed lines] must be completed only by a qualified
professional electrician who has read this manual completely and is familiar with
the construction and operation of this equipment and the hazards involved.
3. Do not affix the unit to walls or ceilings that have inadequate strength to
permanently hold the unit during use. It is the owner's and installer's responsibility
to confirm the wall or ceiling to which the unit attaches is sufficient to permanently
hold the weight and stress loads of the unit at all times. Draper
responsible for improper installation, application, testing, or workmanship related
to the product at place of installation.
4. It is the installer's responsibility to make sure appropriate fasteners are used for
mounting.
5. All hardware must be installed level. Unit must be level and square.
6. Never leave the area while operating the unit during installation, maintenance, or
normal operation, unless it is secure and safe.
7. Before testing or operation, carefully inspect the entire area and path
of unit to be sure no persons or objects are in the area.
underneath)
1. Look for any job site conditions that could interfere with installation or operation of
the system.
2. Read carefully and be sure to understand all installation instructions and all
related operations manuals. These instructions are intended to serve as a guide
for the installer and owner. They should be followed closely and combined with the
expertise of experienced qualified installers. Draper, Inc., is not responsible for
improper installation, application, testing, or workmanship related to the product at
place of installation. Please retain all instructions for future use.
may be packed in cartons separate from screen. Wire connecting screen to switch
(es)
PLUG & PLAY - Provided with 3-button wall switch and 10'
hard wiring required. Three positions
stopped at any point. Factory adjusted limit switches automatically stop
screen when fully down or fully up.
- 3-button UP-
KEY OPERATED SWITCHING - Two key-operated switches optionally
available with this unit:
Key-operated power supply switch controls power to screen
and switches. When "off", switches will not operate screen. Key may
be removed from switch in either "on" or "off" position.
Three-position key switch permits the screen to be operated directly
by key. Requires screen operator to have a key.
WARNING
8. Turn off power and any nearby equipment or cables carrying electricity before
connecting switches, wires, controls, or electrical components.
9. Do not wire motors in parallel without written permission from Draper, Inc.
10. During testing or operation, carefully watch the surrounding area for any potential
safety concerns including nearby persons or objects.
11. After installation, the entire system, including all sensors, should be carefully tested
to ensure safe and normal operation. Extreme care should be taken during testing
to remain clear of moving parts to avoid possible injury.
12. Operation of unit should be performed only by authorized and qualified personnel,
who have been trained in its safe and effective operation and understand its safety
, Inc., is not
features.
®
13. The safety features of the unit should never be disabled, bypassed, or overridden.
The system should not be operated until all safety features are properly and
completely installed, calibrated, and tested.
14. Unit may need to comply with local, state, or district rules and regulations, in
particular when installed in schools. All applicable rules and regulations should be
reviewed before installation and use.
15. Failure to precisely follow installation guidelines invalidates all warranties.
16. Custom products/installations may not be reflected in this manual. Call Draper, Inc.,
(especially
if you have questions about the installation of custom products or any questions
about your installation.
Before Beginning Installation
3. Open cartons lengthwise.
4. Locate and lay out all pieces.
5. Inspect all boxes to make sure you have received the proper unit and parts.
Controls may be shipped separately, or in same carton as unit.
6. If you have any difficulties with installing, servicing, or operating your unit, call your
dealer or Draper, Inc., 765-987-7999.
page 2 of 8
and switch
(es)
, CAN/CSA C22.1, and the National
(CEC)
cord. No
(3m)
permit operation to be
(up-off-down)
Important Safety Information
to power
(es)