Drawell DW-KDN-08D Panduan Petunjuk Pengoperasian - Halaman 6

Jelajahi secara online atau unduh pdf Panduan Petunjuk Pengoperasian untuk Tungku Drawell DW-KDN-08D. Drawell DW-KDN-08D 10 halaman. Digestion furnace

Method of connection of digester furnace

Extraction tee A side with A rubber hose connection with faucet, B side with A rubber hose
connected to the exhaust gas absorption nozzle, C termination rubber hose into the sewer, B end
connection rubber hose shoulds not be too long, digest sewage water flow should be properly (3-4
l/min), to ensure that the suction tee suction, exhaust gas and water together in the sewage (besides
the icon on the mating method is adopted, my company is also equipped with A high matches
connection method: adopt vacuum pumps, filters, and exhaust gas absorption equipment through
rubber hose connection. The filter contains 500-1000ml of lye, which is neutralized by harmful
gases such as SO2, which can be used to filter the harmful substances of adsorption particles.

Digestion furnace temperature control

D-type digital digestion oven, using a new generation of digital temperature controller to
control the digester heating, can display the target temperature and the actual temperature value,
the user can change the heating temperature according to actual needs.

1.Temperature control instrument button description:

a. "PV" display window: shows the current temperature value;
b. "SV" display window: display the new parameter value after setting the
value and the self-defined value;
c. "
" mode menu key: set the temperature value / enter the instrument to view, set parameters,
6
temperature control